Maple Leaf Tracks Inc. Maple Leaf Tracks Inc. Maple Leaf Tracks Inc.
Home
News
Products
Support
Forum
Contact Us
 

KHP - Product Info

Cascades Crossing recreates the operations of the Southern Pacific Railroad in Oregon during the early 1990's. The route spans 220 miles of mainline from the rail centers of Eugene and Klamath Falls, Oregon. Between these two locations lay some very challenging stretches of railway, including a 52 mile stretch of steep mountain territory with plenty of bridges, countless tunnels, and helper locomotives.

The terrain on this route is truly fascinating. In the west you have both urban and rolling farmland. As you move east, you get into heavy coniferous forest. Then, after passing Cascade Summit, you turn south toward Klamath Falls. The scenery turns from heavy coniferous, to a spotted pine forest, to almost desert-like terrain as the railway moves through the rain shadow of the Cascade Mountains.

This add-on pack contains some of the most detailed and largest quantity of rolling stock we have ever added to any package. Also, this package contains some new cutting-edge technologies including dynamic track audio and long range signals, viewable out to 2000 meters (1.25 miles).

Cascades Crossing comes completely ready to run, and requires no extra downloading or installations. Some of the products features are listed below:




Purchase over the Web

$23.00 USD

KHP - Features

220 miles of mainline railway operations
Includes 10 different locomotives, and 43 different pieces of rolling stock
Custom-built bridges and buildings from prototype photos and drawings
US&S Searchlight Signaling with SigView™ technology
Custom Sounds and Cabviews
Challenging activities
Documentation available here
Available by download or on CDrom in slim case
And much more!

System Requirements

  • Microsoft® Train Simulator (1.0 or higher)
  • 16 MB 3D video hardware acceleration or better
  • 600 MB of available hard disk space
  • Remaining minimum hardware requirements same as Microsoft® Train Simulator base requirements

Recommended System Requirements

  • Multimedia PC with a Pentium 1.2 Ghz equivalent or higher processor
  • 64 MB 3D video hardware acceleration or better
  • 512 MB of RAM or higher

***Note: This add-on is very hardware intensive. It is highly recommended that you run it with the recommended hardware requirements ***

Download Requirements:

  •  A high speed connection is recommended.

KHP - Screenshots

Are you interested in expanding your fleet of Southern Pacific locomotives to complement the Cascades Crossing locomotive roster? If so, then we have two expansion packs available which can fit that bill.

SP Heritage Pack - Volume 1

This Heritage Pack features locomotives of the former Southern Pacific Railroad, as they appeared from the 1970's well into the 1990's. The pack includes 6 locomotives and 1 caboose model, all high resolution models and textures.

Product Features

$13.00 USD


SP Heritage Pack - Volume 2

This Heritage Pack features locomotives of the former Southern Pacific Railroad, as they appeared in the mid 1980's well into the 1990's, during the proposed merger of the AT&SF and the SP. These were the Kodachrome years. The pack includes 6 locomotives and 1 caboose model, all high resolution models and textures.

Product Features

$13.00 USD

 

© Copyright 2008 Maple Leaf Tracks Inc. All Rights Reserved. Legal
SP wordmark and logo trademark of Union Pacific RR